Wednesday, June 27, 2007

Foundation

The house has crawl space under the long rectangular section - only the added-on BA and BR (mocha) are slab on grade. BTW, it doesn't sound right to say "on grade" about the BA-BR addition; the slab's top is at least 1.5 foot above grade.

Here is a picture from the crawl space: